The renovation started
in April 2006. The first stage was to take down the wall in the old
kitchen to make one larger room. The other major change was to move
the wall in the bathroom to make it bigger. In the living room the
old chimney was romoved, but the ornate bedroom chimney remains. All
the electrics were modernised and central heating was added, with
the boiler having to be placed in the bathroom ventilated by the main
chimney of the building. The ceilings are near 4m high which is impressive
in the hallway and main reception rooms, but I wanted them lower in
the kitchen and bathroom. Before decorating could start all the walls
needed re-plastering and then fixing.